Engineering Change Management (ECN)
A formal draft → pending-approval → approved/rejected workflow for changing a bill of materials, including shelf-life and cost impact.
Key Features
- Structured change proposal with a diff of what’s changing
- Manager approval required before a change takes effect
Benefits
- No more BOM changes made silently that nobody can explain three months later
Relevant Industries
More in Manufacturing & Production
Manufacturing & Production
Production Orders, Work Orders & Multi-Level BOM
Build multi-level bills of materials, release production batches and work orders with routing and stages, and consume components automatically as production completes.
View ModuleManufacturing & Production
Standard Costing, Cost Rollups & Variance Analysis
A revisioned standard cost per product with material, labour, and machine breakdown, cost rollups through every level of the BOM, and a real 4-way variance analysis against what actually happened.
View ModuleManufacturing & Production
Material Requirements Planning (MRP)
Explodes every draft batch and work order’s bill of materials, nets it against on-hand stock and open purchase orders, and raises a PO straight from a shortfall.
View Module